Skip to content
Module 2 of 3

Module 2 — Costing and Negotiation

Covers garment costing structures and buyer negotiation practice.

What you will be able to do

Build a cost sheet you can defend line by line, and negotiate without giving away the margin by accident.

The practical work

Cost one style from scratch: fabric consumption with wastage, trims, CM from SMV and the minute rate, testing, commission, overhead and profit, up to FOB. Then run a negotiation on the same style and record which line each concession came from and what it did to the margin.

Prerequisite: Read module 1 and pass its quiz first.

Reading for this module

Read these 4 Garment Ed subjects in order, then take the quiz below.

  1. 1. Garment Costing
  2. 2. Consumption and Cost Control
  3. 3. Price Negotiation
  4. 4. Margin and Commercial Risk Management

Module quiz

5 questions on Module 2 — Costing and Negotiation. Answer them all, then check your score before moving on. 4 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.

  1. 1. Fabric consumption is 1.8 m at 4.20 USD/m with 5% wastage. What is the fabric cost per garment?

  2. 2. SMV is 18 minutes and the minute rate is 0.075 USD. What is the CM?

  3. 3. FOB price differs from CM because FOB includes:

  4. 4. A buyer asks for 4% off a 10 USD FOB with a 6% net margin. What is the honest analysis?

  5. 5. Which is a real cost reduction rather than a margin giveaway?

0/5 answered
Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.