Skip to content
Public reference reading

Public reference reading earns no graded credit. Reading activity and private drafts may be saved separately. Sign in to follow the assessed course; required quizzes unlock after earlier required passes, and trainer review is optional.

Sign in to follow the course
Module 3 of 3

Module 3 — Lean Six Sigma for Industrial Engineering

Covers lean and Six Sigma tools applied to industrial engineering problems.

What you will be able to do

Find the waste that actually costs money, map the value stream, and run a DMAIC project with measured before-and-after results.

The practical work

Map the current value stream for one style from fabric store to finishing, marking waiting, transport, inventory, rework and overproduction with real figures. Choose the single biggest loss, define the problem with a baseline number, and run it through DMAIC — including how you will hold the gain in the standard method.

Prerequisite: Read module 2 and pass its quiz first.

Reading for this module

Read these 4 Garment Ed subjects in order, then take the quiz below.

  1. 1. Lean Waste, Flow and Pull
  2. 2. Value-Stream Mapping
  3. 3. DMAIC for Garment Improvement
  4. 4. Productivity and Cost Improvement

Practical worksheet

Map the current value stream for one style from fabric store to finishing, marking waiting, transport, inventory, rework and overproduction with real figures. Choose the single biggest loss, define the problem with a baseline number, and run it through DMAIC — including how you will hold the gain in the standard method.

  1. Identify requirements and assumptions.
  2. Record evidence and calculations.
  3. Choose a decision and containment action.
  4. Assign an owner and verification check.

Module quiz

5 questions on Module 3 — Lean Six Sigma for Industrial Engineering. Answer them all, then check your score before moving on. 4 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.

  1. 1. Which of these is waste in lean terms?

  2. 2. What does the M in DMAIC require?

  3. 3. Rework is 4% of output and the factory doubles final inspection. What is the likely result?

  4. 4. Value-stream mapping is most useful for revealing:

  5. 5. An improvement raises efficiency from 55% to 65% on a 40-operator line of 480 minutes with a 20-minute SMV. How many extra pieces per day?

0/5 answered

Applied assessment

Name the waste you are removing, choose the right improvement route and prove the gain. 8 questions that ask you to decide or calculate from a real situation, 75 per cent to pass, unlimited attempts.

Take the applied assessment

My progress in this course

Structured certification

Opening your learning…

Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.