Applied assessment · Industrial Engineering and Production Planning for Garment Factories

Applied assessment — lean flow and structured improvement

Name the waste you are removing, choose the right improvement route and prove the gain.

Every question asks you to decide, judge or calculate from a situation rather than recall a definition. 8 questions, 70 per cent to pass, as many attempts as you like, and your best score is kept. Read the module and its readings first — this is a self-study assessment, not an accredited examination.

Module quiz

8 questions on Module 3 — Lean Six Sigma for Industrial Engineering. Answer them all, then check your score before moving on. 6 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.

  1. 1. Bundles of cut parts sit two days between cutting and sewing. Which waste is that, and what does it cost?

  2. 2. What does a value stream map show that a line layout does not?

  3. 3. In DMAIC, what belongs in the Measure phase?

  4. 4. A team proposes a solution in the first meeting, before any data. What is the main risk?

  5. 5. Which pair of measures shows a real productivity gain rather than a shifted cost?

  6. 6. What makes a 5S or workplace-organisation change stick?

  7. 7. Single-piece flow is proposed on a line making a complex jacket. What is the honest caution?

  8. 8. An improvement is signed off with a 12 per cent efficiency gain measured on one day. What is missing?

0/8 answered