Applied assessment — lean flow and structured improvement
Name the waste you are removing, choose the right improvement route and prove the gain.
Module quiz
8 questions on Module 3 — Lean Six Sigma for Industrial Engineering. Answer them all, then check your score before moving on. 6 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.
1. Bundles of cut parts sit two days between cutting and sewing. Which waste is that, and what does it cost?
2. What does a value stream map show that a line layout does not?
3. In DMAIC, what belongs in the Measure phase?
4. A team proposes a solution in the first meeting, before any data. What is the main risk?
5. Which pair of measures shows a real productivity gain rather than a shifted cost?
6. What makes a 5S or workplace-organisation change stick?
7. Single-piece flow is proposed on a line making a complex jacket. What is the honest caution?
8. An improvement is signed off with a 12 per cent efficiency gain measured on one day. What is missing?