Applied assessment — quality systems and control plans
Decide what a control plan must say, where a check belongs, and how a corrective action is closed rather than merely recorded.
Module quiz
8 questions on Module 1 — Quality Systems. Answer them all, then check your score before moving on. 6 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.
1. A control plan lists 'check measurements — as per buyer'. What is the defect in the plan itself?
2. Fabric arrives with a shade variation the store cannot resolve. Where in the plan should this be caught, and by whom?
3. Which action is containment rather than corrective action?
4. A CAPA is signed off two days after it was raised, with 'operator advised' as the root cause. What is wrong?
5. Your factory holds a quality-system certificate but the same seam defect recurs every month. What does that indicate?
6. Which of these belongs in the control plan as a critical-to-quality characteristic for a children's garment?
7. A buyer asks why your factory's own reject rate is lower than their inspection result. What is the most likely honest explanation to check first?
8. What makes a quality objective useful rather than decorative?