Skip to content
Module 2 of 6 · Free · Self-paced

2. Material cost and sourcing

Calculate fabric and trim cost from consumption, price, wastage and sourcing terms.

Calculate fabric cost per garment from consumption, width, GSM and price, then add a stated wastage allowance. Compare two supplier quotations on landed cost — price, minimum order quantity, freight, payment terms and lead time — rather than unit price alone.

By the end of this module: Calculate fabric and trim cost from consumption, price, wastage and sourcing terms.

Prerequisite: Complete module 1 and its readings first.

Who this module is for · Intermediate

  • Merchandisers and costing staff building and defending cost sheets
  • Industrial engineers working on minutes, efficiency and line balancing
  • Factory managers and owners who need to see where margin is lost

This module stands on its own — study it in any order. Your reading, quiz score and capstone are saved on this device, and to your account when you sign in. See your progress for this course.

1. Read these chapters

2. Then work through these stages

Module quiz

5 questions on 2. Material cost and sourcing. Answer them all, then check your score before moving on. 4 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.

  1. 1. Fabric consumption is 1.8 metres per piece at 3.00 per metre. What is the fabric cost per piece before wastage?

  2. 2. Adding a 5% wastage allowance to that 5.40 gives approximately what?

  3. 3. Why is the lowest quoted fabric price not always the lowest cost?

  4. 4. A supplier's fabric arrives with a higher defect rate. Where does that cost appear?

  5. 5. Which record makes a material cost defensible?

0/5 answered
Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.