Skip to content
Public reference reading

Public reference reading earns no graded credit. Reading activity and private drafts may be saved separately. Sign in to follow the assessed course; required quizzes unlock after earlier required passes, and trainer review is optional.

Sign in to follow the course
Module 3 of 6 · Free · Self-paced

3. Fabric utilisation in the cutting room

Turn marker efficiency and spreading losses into money, and find utilisation savings that hold up in practice.

Build a cutting-room material balance and convert it to money: fabric issued, garments cut, end losses, defects and remnants. Compare marker efficiency with actual fabric utilisation and price the gap at the order's fabric rate.

By the end of this module: Turn marker efficiency and spreading losses into money, and find utilisation savings that hold up in practice.

Prerequisite: Complete module 2 and its readings first.

Who this module is for · Intermediate

  • Merchandisers and costing staff building and defending cost sheets
  • Industrial engineers working on minutes, efficiency and line balancing
  • Factory managers and owners who need to see where margin is lost

This module stands on its own — study it in any order. Your reading, quiz score and capstone are saved on this device, and to your account when you sign in. See your progress for this course.

Go deeper

The cutting-floor quality and waste detail, in full:

1. Read these chapters

2. Then work through these stages

Module quiz

5 questions on 3. Fabric utilisation in the cutting room. Answer them all, then check your score before moving on. 4 correct or more is a pass. Your best score is saved on this device, and to your account when you are signed in. This is a self-check, not an accredited assessment.

  1. 1. A marker places 88 square metres of pattern in a 100 square metre marker. What is marker efficiency?

  2. 2. Why is marker efficiency higher than actual fabric utilisation?

  3. 3. Utilisation improves by 2% on an order using 100,000 metres of fabric at 3.00 per metre. What is the saving?

  4. 4. Which action most reliably reduces cutting-room material cost?

  5. 5. What closes a cutting-room material balance?

0/5 answered

Structured certification

Opening your learning…

Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.