Module 10 assessment
Sewing, Construction & Production Management
5 questions. 80% passes the module, and you can retry as often as you like. Every answer is explained, so a wrong answer still teaches you something. This is self-study practice written by Sanjeewa Dehiwalage, not an examination.
- Question 1Multiple choice
Stitch density is normally specified as
- Question 2Multiple choice
Seam puckering on a lightweight woven is most often caused by
- Question 3True or false
Work in progress piling up in front of one station is a signal, not a normal condition.
- Question 4Multiple choice
Needle damage on a knit fabric is best reduced by
- Question 5Factory scenario
End-line defects rise sharply after a style change. What do you check first?
Practical exercise
Write the operation breakdown for a short sleeve tee and mark which operations carry the highest quality risk and why.
Factory case study
Two lines make the same style; one runs 15 per cent lower efficiency. Describe how you would compare method, layout, skill and machinery.