Module 15 assessment
Machine Maintenance, Engineering & Factory Utilities
5 questions. 80% passes the module, and you can retry as often as you like. Every answer is explained, so a wrong answer still teaches you something. This is self-study practice written by Sanjeewa Dehiwalage, not an examination.
- Question 1Multiple choice
Preventive maintenance is scheduled work aimed at
- Question 2Multiple choice
Compressed air leaks matter because
- Question 3True or false
Steam trap failure affects both energy cost and finishing quality.
- Question 4Multiple choice
Machine downtime should be recorded by
- Question 5Factory scenario
One sewing line reports repeated thread breakage on the same machine type. What is the maintenance route?
Practical exercise
Write a preventive maintenance card for one machine: tasks, frequency, who does it, and the record kept.
Factory case study
Energy cost per garment rose 12 per cent with the same product mix. Build the investigation across utilities, maintenance and behaviour.