Skip to content
Skip to content
GARMENT Ed
Public reference reading

You are reading this page as a free public reference resource. Sign in with a free learner account to follow the structured course, where each step unlocks only after the previous one is passed.

Sign in to follow the course

Module 7 · Lesson 7 of 24

Flow, bottlenecks, and constraints

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Explain the purpose of flow, bottlenecks, and constraints in garment operations.
  • Describe when and how to apply flow, bottlenecks, and constraints on the shop floor.
  • Identify common mistakes and how to avoid them.

Core idea

Flow moves work continuously; a bottleneck limits local capacity, while the system constraint governs total throughput.

Method

Measure demand, cycle times, queues, availability, and blocking/starving; protect the true constraint and improve whole-system flow. Avoid maximizing every station independently.

Garment-factory example

A sleeve-setting operation may build WIP, but cutting release or finishing capacity may constrain the complete order.

Method

  1. Measure demand, cycle times, queues, availability, and blocking/starving;
  2. protect the true constraint and improve whole-system flow

Common mistakes

  • Avoid maximizing every station independently

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Which statement best captures the core idea of Flow, bottlenecks, and constraints?

  2. 2. A common mistake when applying flow, bottlenecks, and constraints is to:

Author: NOSK.life · Last reviewed: 2026-07-21

Structured certification

Opening your learning…

© NOSK.LIFE — training content for personal learning on NOSK.LIFE only. Copying or reuse requires written permission.