Skip to content
Skip to content
GARMENT Ed
Public reference reading

You are reading this page as a free public reference resource. Sign in with a free learner account to follow the structured course, where each step unlocks only after the previous one is passed.

Sign in to follow the course

Module 7 · Lesson 4 of 24

The seven wastes plus unused human potential

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Explain the purpose of the seven wastes plus unused human potential in garment operations.
  • Describe when and how to apply the seven wastes plus unused human potential on the shop floor.
  • Identify common mistakes and how to avoid them.

Core idea

Transportation, inventory, motion, waiting, overproduction, overprocessing, defects, and unused human potential consume resources without customer value.

Method

Use specific observable examples and data; trace systemic causes. Do not blame people or treat all inventory as equally avoidable.

Garment-factory example

Excess bundle travel, WIP racks, reaching, machine waiting, early production, duplicate inspection, repairs, and ignored operator ideas.

Method

  1. Use specific observable examples and data;
  2. trace systemic causes

Common mistakes

  • Do not blame people or treat all inventory as equally avoidable

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Which statement best captures the core idea of The seven wastes plus unused human potential?

  2. 2. A common mistake when applying the seven wastes plus unused human potential is to:

Author: NOSK.life · Last reviewed: 2026-07-21

Structured certification

Opening your learning…

© NOSK.LIFE — training content for personal learning on NOSK.LIFE only. Copying or reuse requires written permission.