Project charter construction

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Assemble the elements of a project charter.
  • Obtain sponsor and process-owner authorization.
  • Keep the charter current through DMAIC.

The charter is a control document

Include business case, problem, goal, scope, timeline, team, roles, benefits, risks, milestones and approvals. It is a living control document, not ceremony.

Garment-factory example

A needle-damage reduction charter identifies the product family, customer risk, current defect rate, target, excluded supplier-redesign work, team, tollgate dates and benefit method.

Method

  1. Draft with sponsor and process owner.
  2. Validate data before approval.
  3. Challenge scope and resources.
  4. Review at every tollgate.

Common mistakes

  • Copying a generic charter.
  • Omitting process owner or benefit validation.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. The charter is:

  2. 2. Authorization gives the team: