Skip to content
Skip to content
GARMENT Ed
Public reference reading

You are reading this page as a free public reference resource. Sign in with a free learner account to follow the structured course, where each step unlocks only after the previous one is passed.

Sign in to follow the course

Module 5 · Lesson 12 of 17

Planning a practical garment-factory experiment

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Explain the purpose of planning a practical garment-factory experiment in a garment-factory improvement project.
  • Apply the described method to a representative shop-floor situation.
  • Recognize the common mistakes and how to avoid them.

Concept

A practical DOE plan joins statistical design with safety, production, material, measurement, and operational controls.

Include purpose, hypotheses, factors/ranges, response, sample size, random order, blocks, replication, material lots, gauge readiness, hold/release rules, safety, stop criteria, data sheet, and approvals.

Deviations must be recorded and never silently replaced by convenient runs.

Variables, units, and assumptions

Temperature (°C), pressure (kPa), dwell (s); bond strength (N/cm).

Gauge repeatable, panels representative of lot, operators trained.

Free-spreadsheet workflow

Free spreadsheet: list all runs, assign random order with RAND(), block by lot, execute, record Y and deviations.

Interpretation and limitations

Compare effect estimates to replicate SD to judge significance and practical importance.

Findings valid only within tested ranges and lot conditions.

Garment-factory example

Test fusing temperature, pressure, and dwell time using panels blocked by fabric lot, with bond strength and appearance responses.

Method

  1. Confirm MSA.
  2. Complete risk review.
  3. Generate run sheet.
  4. Label specimens.
  5. Brief the team.
  6. Execute randomized runs.
  7. Log deviations.
  8. Preserve samples.

Common mistakes

  • Letting operators choose run order.
  • Altering settings outside approved limits without documentation.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Deviations from the run plan must be:

  2. 2. Blocking by fabric lot controls:

Author: NOSK.life · Last reviewed: 2026-07-21