Skip to content
Skip to content
GARMENT Ed
Public reference reading

You are reading this page as a free public reference resource. Sign in with a free learner account to follow the structured course, where each step unlocks only after the previous one is passed.

Sign in to follow the course

Module 10 · Lesson 15 of 18

Rework, repair, and cost-of-quality reduction

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Categorize prevention, appraisal, internal and external failure costs.
  • Convert defect and rework minutes into validated financial impact.
  • Prioritize interventions by financial leverage, not defect count alone.

Problem and CTQ

Internal failures consume labour, material and capacity while hiding true performance. COPQ is the currency of the improvement portfolio.

DMAIC path

  • Define prevention, appraisal, internal and external failure costs.
  • Map repair loops; capture defect, origin, detection, minutes, material and disposition.
  • Validate the finance conversion with the plant controller.

Improvement choices

  • Source prevention and feedback.
  • Standard settings/method and poka-yoke.
  • Risk-based appraisal and controlled repair authorization.

Control plan

  • COPQ, repair minutes/garment, rework %, scrap, repeat repair, capacity recovered and external claims.

Garment-factory example

A trouser line spends 42 repair minutes per 100 garments at USD 0.09/min = USD 3.78 per 100 garments. Fixing hem-close needle marks at source cuts repair to 18 minutes and releases 24 minutes/100 pieces to productive capacity.

Common mistakes

  • Counting released minutes as cash without redeployment.
  • Double-counting the same saving in quality and productivity ledgers.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. COPQ is best used to:

  2. 2. Released repair minutes convert to cash when:

Author: NOSK.life · Last reviewed: 2026-07-21

Structured certification

Opening your learning…

© NOSK.LIFE — training content for personal learning on NOSK.LIFE only. Copying or reuse requires written permission.