Skip to content
Skip to content
GARMENT Ed
Public reference reading

You are reading this page as a free public reference resource. Sign in with a free learner account to follow the structured course, where each step unlocks only after the previous one is passed.

Sign in to follow the course

Module 4 · Lesson 5 of 22

Cause-and-effect matrix

← Back to moduleBack to academy
Listen to this article
Ready
100% Free

This lesson and the entire Lean Six Sigma Black Belt academy are free of charge — no fees, ever.

Learning objectives

  • Weight CTQ outputs against process inputs.
  • Score relationships consistently across the team.
  • Select the vital few Xs for validation.

Prioritising Xs

  • List CTQ outputs with weights (1–10).
  • List process steps and inputs from the detailed map.
  • Score relationships with 0/1/3/9.
  • Sum weighted scores; sensitivity-check the top Xs.

Garment-factory example

For collar appearance, folder setting, seam allowance, operator handling, feed balance and material stretch are scored against symmetry, puckering, dimension and strength; the top three Xs feed the data plan.

Method

  1. Confirm CTQs and weights with the sponsor.
  2. Calibrate scoring definitions before rating.
  3. Score cross-functionally and reconcile outliers.
  4. Plan data collection for the top Xs.

Common mistakes

  • Treating scores as measured effects.
  • Letting one manager set all scores.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. The C&E matrix output is best used as:

  2. 2. Scoring is safer when:

Author: NOSK.life · Last reviewed: 2026-07-21

Structured certification

Opening your learning…

© NOSK.LIFE — training content for personal learning on NOSK.LIFE only. Copying or reuse requires written permission.